《采購合同 - 建筑材料-英文》由會員分享,可在線閱讀,更多相關(guān)《采購合同 - 建筑材料-英文(2頁珍藏版)》請在裝配圖網(wǎng)上搜索。
1、Material Purchase Contract
THIS CONTRACT (“Contract”) is made and entered into at Bayah, Indonesia on this day of 15 June, 2013 under terms and conditions as per the laws of the republic of Indonesia by and between:
The Buyer: PT. Sinoma Engineering Indonesia
Tel: 081318114988
The Seller:
2、Cv. Mandiri Putri
Tel: 085324240009
Whereby after friendly consultations conducted in accordance with the principles of equality and mutual benefit, Buyer agrees to buy from seller and seller agrees to sell to buyer Building Materials under the following terms and conditions:
1. Buyer shall
3、 give seller the material demand schedule based on site situation, and seller shall, at the time and with the material quantity required by buyer, supply to buyer the materials that meet the quality requirements according to the material demand schedule;
2. Seller shall be responsible to delivery
4、 and unload the material at the location appointed by buyer. Before the unloading of materials, buyer and seller shall jointly inspect the quality and quantity of delivered materials on site and sign to acknowledge the receipt of material hereto;
3. Buyer and Seller shall, at the end of each month,
5、 confirm and verify the supplied materials for the current month. After the confirmation, Seller shall submit to buyer the value-added tax invoice (pph) in accordance with the confirmed work quantity and contract price; Buyer shall pay the payment for materials to Seller after receipting VAT invoice
6、.
4. Buyer shall ensure that the transport road is unblocked and smooth so that the material can be transported to the appointed area;
5. Seller shall not delay the delivery of required materials deliberately or for the reasons that Buyer does not accept, and Seller shall guarantee that the delive
7、red materials comply with the construction requirement on site.
S/N
Material
Specification
Unit
Quantity
Unit price(RP)
Remarks
1
Rubble
20-30cm
M3
1
110000
Freight is included but tax is not included.
2
Gravel
2-2.5cm
M3
1
230000
3
Medium sand
River sand
M3
1
190000
4
8、
Wood block
5.5cm*5.5cm*3m
Piece
1
6500
5
Brick
Piece
1
600
In the event of any dispute, controversy or claim (collectively, “dispute”) arising out of or relating to this Contract, or the breach, termination or invalidity hereof, the Parties shall attempt in the first instance to resol
9、ve such dispute through friendly consultations.
This Contract is executed in duplicate in English; Buyer and Seller hold one respectively with the same level legal effect since the signature of both parties.
IN WITNESS WHEREOF, each of parties hereto has caused this Contract to be executed by its duly authorized representative on the date first set forth above.
Party A
PT. Sinoma Engineering Indonesia
Party B
Cv. Mandiri Putri
signature
signature
Date
15 June, 2013
Date
15 June, 2013