《(江蘇專用)2020版高考英語大一輪復(fù)習 Unit 4 Public transport高效演練跟蹤檢測(含解析)牛津譯林版選修7》由會員分享,可在線閱讀,更多相關(guān)《(江蘇專用)2020版高考英語大一輪復(fù)習 Unit 4 Public transport高效演練跟蹤檢測(含解析)牛津譯林版選修7(4頁珍藏版)》請在裝配圖網(wǎng)上搜索。
1、Unit 4 Public transport
品句填詞
1.According to the newly-made traffic regulation, whoever drives through red light shall be fined(罰款) at least 200 dollars.
2.The weather being bad, we had to postpone(推遲) our trip.
3.There are more and more family problems arising(出現(xiàn)) from the lack of communica
2、tion.
4.The heavy storm choked(堵塞) off traffic.
5.The truck was loaded(裝載) with bananas.
6.The tunnel is one of the biggest engineering projects onceundertaken (承擔) in this district.
7.I called the airline to confirm my flight reservation(預(yù)訂) a week before I left for Canada.
8.The children were
3、 split(分開) up into four groups by the teacher.
9.I’m committed not to violating(違反) the rules.
10.He went black in the face when I told him I had crashed(碰撞) his car.
完成句子
1.為什么不再給他一次機會呢?畢竟,他那么愛你。
Why not give him another chance?After all,he loves you so much.
2.歧視那些得艾滋病的人是不對的。
It is not rig
4、ht to look down upon those who have AIDS.
3.進來一個小姑娘,穿著白色的裙子。
In came a girl,wearing a white skirt.
4.我們大家都有責任解決我們街區(qū)的問題。
It’s up to all of us to solve the problems in our neighbourhood.
5.在農(nóng)場工作了10個小時,瑪麗筋疲力盡,渾身酸痛。
Having worked for 10 hours on the farm, Mary was tired out and her body hurt.
單項
5、填空
1.They are broadening the bridge to________the flow of traffic.
A.put off B.speed up
C.turn on D.work out
B 解析:考查動詞詞組辨析。 句意:他們在加寬橋面, 用以加快車流速度。 put off“推遲, 暫緩”; speed up“加快速度”; turn on“打開, 呈現(xiàn)”; work out“解決, 鍛煉, 設(shè)計出”。
2.To his disappointment, many people who had taken part in the activity
6、 ________ halfway.
A.left out B.got out
C.passed out D.dropped out
D 解析:句意:令他失望的是, 許多已參加該活動的人半路退出了。 drop out“退出”。
3.He was glad to have an excuse to ________ telling her the bad news.
A.put up B.put on
C.put off D.put away
C 解析:考查put短語辨析。 句意:他很高興找到借口推遲告訴她這個不好的消息。 put up“舉起, 張貼; 搭建; 為某人提供住宿”
7、; put on“穿上, 上演”; put off“推遲”; put away“收起”。
4.________ time going on, we come to learn to accept life as it is.
A.As B.With
C.While D.If
B 解析:as和with都可表達“隨著……”的意思。 as 用作連詞, 引導(dǎo)的是一個時間狀語從句。 with介詞, 后接名詞短語作賓語。 分析句子結(jié)構(gòu)可知答案應(yīng)為B項。
5.The ministry didn’t expect ________ quite such a negative reaction fr
8、om farmers.
A.there being B.it
C.to be D.there to be
D 解析:expect后需跟動詞不定式作賓語, there be結(jié)構(gòu)的動詞不定式是there to be。
6.—I’m worried about the sports meet. Do you think it ________?
—If it should rain tomorrow, but actually the weather forecast has removed our worry.
A.will postpone B.was postponed
C.
9、has been postponed D.will be postponed
D 解析:句意:“我擔心這次運動會。你覺得它會延期嗎?”“如果明天下雨的話(它就會延期),但事實上天氣預(yù)報打消了我們的疑慮?!备鶕?jù)but后答語的內(nèi)容可知,if從句是與將來事實相反的虛擬語氣,所以應(yīng)用一般將來時的被動語態(tài)。
教材與話題寫作
用本單元所學(xué)知識完成下列句子,并按照邏輯連成短文。
1.大中城市的交通阻塞問題因為越來越多的車輛而產(chǎn)生了。
Traffic jams in metropolitan and medium-sized cities have arisen from the increa
10、sing number of cars.
2.公共交通工具像公共汽車、電車、出租車等都不能自由地運送客人。
The public traffic vehicles such as bus,tram,cab and so on can’t convey passengers freely.
3.權(quán)威部門決定修地下隧道來解決交通問題。
The authority decided on digging underground tunnel to solve the traffic problems.
4.地鐵的出現(xiàn)使得大量的乘客上下車成為可能。
The underground’s tur
11、ning up makes it possible to pick up and drop off passengers in large numbers.
5.地鐵把城市的不同部分連接起來,承載乘客,加快了乘客的運送速度,承擔了很重的運輸任務(wù)。
The underground links up different parts of the cities, loads passengers, speeds up conveying passengers and undertakes heavy transporting tasks.
組篇公式:用現(xiàn)在分詞作狀語改寫句5。
_______
12、_________________________________________________________________
________________________________________________________________________
________________________________________________________________________
________________________________________________________________________
___________
13、_____________________________________________________________
________________________________________________________________________
________________________________________________________________________
One possible version:
Traffic jams in metropolitan and medium-sized cities have arisen f
14、rom the increasing number of cars. The public traffic vehicles such as bus,tram,cab and so on can’t convey passengers freely. As a result,the authority decided on digging underground tunnel to solve the traffic problems. So the underground’s turning up makes it possible to pick up and drop off passengers in large numbers. Linking up different parts of the cities,the underground loads passengers,speeds up conveying passengers and undertakes heavy transporting tasks.
4